BAS 120933
Elmoresstraße overpass
Keine weiteren Bilder verfügbar
Germany
North Rhine-Westphalia
Windeck-Schladern (Sieg)
Street
railroad
Beam bridge
WIB - Rolled beams in concrete
-2.00 m
0.00 m
0.00 m
0.00 m
0.00 m
0.00 m2
in operation
The northern section with the two tracks is to be replaced by a new steel trough structure for each track starting in 2026. The southern section is to remain.
InfraGo
A map is loading