BAS 1219
Erasmusbrug

© Frank Sellke / brueckenweb.de

Brücke im Bau
15.03.1996
© Hans van Heijningen

Herbst 1996
© Hans van Heijningen
Netherlands
Zuid-Holland
Rotterdam
Centrum, Waterstad
Nieuwe Maas
Road / tram
Cable-stayed bridge, movable bridge: Bascule bridge
Steel
1994-1996
285.00 m
803.00 m
0.00 m
0.00 m
0.00 m
0.00 m2
in operation
modern design, on the South side: bascule bridge<br><br>14.11.1991 Decision in the City Council for the bridge<br>February 1992 the bridge receives your name<br>1994 Start of work<br>13.04.1995 Assembly of the pylons with a floating crane<br>27.01.1996 Mounting the roadway section of the bascule bridge<br>04.09.1996 Opening<br>
A map is loading