
22.08.2007
© Helmut Fischer

Rhinstraßenbrücke / EU Strecke Berlin - Strausberg, Ahrensfelde, im Bild rechts
12.2.2019
© Helmut Fischer

22.08.2007
© Helmut Fischer
A map is loading

22.08.2007
© Helmut Fischer

Rhinstraßenbrücke / EU Strecke Berlin - Strausberg, Ahrensfelde, im Bild rechts
12.2.2019
© Helmut Fischer

22.08.2007
© Helmut Fischer
A map is loading
The bridge has 3 buildings. In the middle of the power supply cable be on private construction over transferred. On both sides there is a superstructure with 2 lanes, 1, wheel - and Gehbahn and Inn Enge Empire each ensured a Straßenbahngleis.Diese bridge the change derStraße and tram ride away from the old Lichtenberger bridge. She opened the way the Lichtenberger that for the new bridge and at the same time opened up the tangential connection of Schöneweide, Karl Horst, Friedrichsfelde Lichtenberg Northeast and Hohenschönhausen.Der new district of Marzahn was also approachable this, because the development via today's Märkische Allee was not guaranteed. My personal commitment to this bridge was the Hauptauftraggeberseitige construction management for this bridge for road and construction Office in Berlin. Construction manager of the contractor for the reinforced concrete work of Horst Klingauf the motorway construction works and for the construction of steel were Mr. Tischer. Design was the design and engineering design operation of road and pavement engineering in Berlin.